BEFORE YOU BEGIN
CAUTION
Risk of personal injury or
product damage.
Handle with care. Vitreous china can break
or chip if the product is handled carelessly.
• Prior to installation, unpack the new lavatory
and inspect for damage. Return the lavatory
to its protective carton until you are ready to
install it.
TOOLS AND MATERIALS
Level
Drill with
assorted bits
Framing square
INSTALLATION
Finished wall
4" 4"
3-6/11"
14-1/2"
8-7/12"
21-1/2"
Finished floor
28-3/4"
• These instructions are for installing the
lavatory to wood frame construction. For
other installations, supply suitable bracing
and fastening devices of sufficient size
and strength.
• The walls and floor must be square, plumb,
and level.
Tape measure
9/16" wrench
Channel lock
pliers
10-1/4"
2-1/2"
10"
9-7/8"
1/2" d. anchor
holes in lavatory
3/8" hot
34"
1-1/4" OD
3/8" cold
4"
4-5/8"
1
INSTALLATION
Lavatory
Finish
wall
Pedestal
Center line
• Mark the centerline on the floor.
• Position the pedestal on the floor centerline.
• Carefully set the lavatory on the pedestal.
• Move the pedestal as required to ensure
proper fit in the desired location.
• Level the lavatory.
NOTE: The lavatory must be supported by
the pedestal.
10-1/4"
1/2" d.
anchor
34"
holes in
lavatory
• Check the lavatory placement.
• Mark the center of each anchoring hole on
the wall.
• Carefully remove the lavatory from the
pedestal. Then move the pedestal from
the area.
Hanger bolts
Finish wall
(cont.)
• Drill two 1/4" hanger bolt holes at the
marks on the wall.
• Mount hanger bolts to the wall so
approximately 1-1/4" (3.2cm) of each bolt
remains exposed.
NOTE: Other fastening devices of sufficient
size and strength may also be used.
• Install the faucet and drain to the lavatory
according to the manufacturer's instructions.
NOTE: Do not fully tighten slip-joint drain
connections at this time.
Hanger bolts
Lavatory
Finish wall
• Set the lavatory on the pedestal so the hanger
bolts extend through the lavatory holes.
• Level the lavatory.
Level
Nut
Washer
2