Modelo AD233: MANUAL DE USUARIO
Insert red test leads to V1 input terminal.
¾
Insert blue test leads to V2 input terminal
¾
Insert yellow test leads to V3 input terminal
¾
Connect red blue and yellow test leads to every live wire of the 3 phase.
¾
Insert black test leads to COM input terminal and connect it to the neutrual wire of the 3 phase.
¾
When measuring 3 phase 3 wires, connect the Meter as figure 5
z
Insert red test leads to V1 input terminal.
¾
Insert blue test leads to V2 input terminal
¾
Insert black test leads to COM input terminal
¾
Connect red blue and black to every neutrual wire of the 3 phase.
¾
Yellow test leads is not necessary for this kind of measurement.
¾
When measuring single phase 2 wires, connect the Meter as figure
z
Insert red test lead to V1, V2 or V3 input terminal corresponding to one of Ø 1, Ø 2 or Ø 3 phase
¾
Insert black test leads to COM input terminal.
¾
24