Assembly, Steps 7,8,9 - HAMPTON BAY 80434/25MM4495-PB84 Guía De Uso Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly (continued)
7
Back Cross Panel installation
Insert Wood Dowels (CC) into the holes on the Top
Panel (G).
Push Back Cross Panel (N) to the Top Panel (G).
Insert Screws (II) through the pre-drilled holes in the Top
Panel (G) and tighten.
Hardware Used
Part
Description
CC
Wood Dowel
II
Screw
II
N
CC
9
Back Panel installation
Attach the Side Back Panel (I) and the Center Back Panel
(J) to the back of the completed assembly from step 8.
Insert screws (FF) through the pre-drilled holes in the
Back Panels to the completed assembly. Hand tighten.
Use a Phillips Head Screwdriver to tighten the bolts that
were hand tightened.
Hardware Used
Part
Description
FF
Screw
8
Qty
Hardware Used
3
Part
4
CC
DD
G
Qty
32
9
Mantel/Top installation
Locate Mantel/Top (G) and lay finished side up on top of
completed assembly.
From the inside, attach the Mantel/Top (G) using
Bolt (DD) through the pre-drilled holes in the Plastic
Connector.
Use a Phillips head screwdriver, hand-tighten all Bolts
alternating top and bottom, left and right.
Description
Wood Dowel
Bolt
DD
G
CC
J
I
Please contact 1-877-527-0313 for further assistance.
Qty
4
6
CC
FF
I
HAMPTONBAY.COM

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

000 000

Tabla de contenido