Complete The Installation - Kohler K-1234 Guia De Instalacion

Ocultar thumbs Ver también para K-1234:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Secure Frame
Square
Frame
Support
Structure

3. Complete the Installation

Secure Frame
Square the frame to the rim of the bath/whirlpool.
Secure the sides of the frame to the studs with the screws provided. Shim as necessary to fill any
gaps.
Secure the bottom of the frame to the subfloor with screws or floor anchors. Shim as necessary to fill
any gaps.
Thread the carriage bolt out until it makes contact with the bath/whirlpool. Then secure by
tightening the two wing nuts.
Secure Panel
Center the panel on the frame. Press the panel onto the frame so that each of the fasteners engage.
Finish the Installation
Install water-resistant wall material [1-1/2" (3.8 cm) maximum thickness] to complete the finished
wall.
Install flooring material [2" (5.1 cm) maximum thickness] to complete the finished floor.
Service
Using a flat-blade screwdriver, gently pry the bottom of the apron panel away from the apron
frame.
Kohler Co.
Carriage
Bolt
Bath/
Whirlpool
Fastener
Shim,
if necessary.
Subfloor
Screw
5
Secure Panel
Panel
Service
Panel
Flat-Blade
Screwdriver
Frame
Frame
1011308-2-D

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1284

Tabla de contenido