Cable Junction Box PR 6130/08
4.4 Attaching the cable gland
EN-12
1.
Remove the parts from the packaging.
2. Screw the cable gland (2) into the cable junction box and tighten at the hex.
Note:
It is essential that the following tightening torques are observed:
M20: 4 Nm
M25: 6 Nm
3. Screw the cap nut (1) onto the cable gland and tighten slightly.
4 Installation and connection information
Minebea Intec