part facing upwards, and locking them with component B02. Using and Ø 8 mm bit to drill the
holes, fix component F34 to the floor (only when the railing is being mounted on the left side
of the flight) so that it corresponds with the first baluster (C67). Use items C58, B12 and B02.
Insert the baluster (C67) and tighten item B02 (fig. 1). Make sure that each baluster is vertical.
Starting from the highest baluster, attach the handrail A13 with items C64 and the screw-driver
(leave a sufficient quantity of handrail so that you can fix the baluster C67, which has not yet been
inserted, in the end position). Join the comoponents of the handrail A13 with items B33 and with
the adhesive (X01). In correspondence with the first and last balusters, cut of the excess handrail
and complete the mounting by inserting component A12, using item C64 and the adhesive X01.
17. I nsert the steel cables F26 into items C69 present on the balusters. Lock the cables at one of
the two ends with items D37 and BB7, leaving around 5mm of the cables protruding from the
items D37. Tighten the cables by hand and lock them with items D37 and BB7. Cut off the cables
at a distance of 5 mm from item D37. Screw on the D36 cable protection components.
Warning: when cutting the cables we advise wrapping the cable end with adhesive tape so as to
avoid the cable unraveling. Use suitable shears.
Final Assembly
18. V erify that the whole staircase is vertical, and if necessary adjust it by moving support N16 (fig. 1).
19. D etach the first step L40 and, using a Ø 14 mm bit, drill holes in the floor in line with the holes in
support N16 (fig. 1).
20. Insert components F20 and permanently tighten them (fig. 1).
21. Replace the first step L40.
22. Complete the staircase assembly by inserting items C74 into the balusters C67 (fig. 1).