Part List; Inspection And Maintenance - Ducatillon flo Modo De Empleo

Tabla de contenido

Publicidad

Assembly - Montage - Instalación - Montaggio
1
3
5
10
5
Metalldoppelsitz 'flo'- asiento doble metálico 'flo' - barchetta metallica 'flo'
2
4
5
10
Chasse
Pêche
Assembly
See drawing at the back for:
- assembly instructions
- specific intructions for adjusting the ropelength

Part list

Take all parts out of the packaging and check if anything is damaged, and if all parts are present.
A
back (2x)
D
frame (1x)

Inspection and maintenance

The frequency of inspection and maintenance will vary with the type of equipment or materials used or
other factors (e.g. heavy use, levels of vandalism, coastal location, air pollution, age of equipment, ...).
Special attention should be given to the swing hooks, rings, eights, plastic welds and ropes. Moving metal
parts must be oiled regularly.
Routine visual inspection (weekly to monthly)
- Check that the bolts and nuts are securely fastened.
- Check the shock absorbing surface for objects that don't belong there.
- Check for missing parts.
- Check the equipment ground clearances.
Operational inspection (1 to 3 months)
- Check the stability of the construction.
- Check every part for excessive wear and remove when necessary.
Annual inspection (1 up to 2 times per year)
- Check for rust and corrosion.
- Check every part for excessive wear and remove when necessary.
metal duoseat 'flo' - metalen dubbelzit 'flo' - balancoire double 'flo'
Loisir et nature
Jardin
B
C
seat (2x)
bumper (2x)
E
rope (4x)
www.ducatillon.com
Instructions for use - M164.04 - metal dual seat - flo
Élevage

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

164

Tabla de contenido