Initial Start-Up; Procedure For The Asc5000Rpa, Asc5500Rpa; Setting Up And Switching On; Internal Leak Inspection - Waeco AirConService ASC5000RPA Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Initial start-up

7
Initial start-up
7.1

Procedure for the ASC5000RPA, ASC5500RPA

internal leak inspection

The internal unit pressure test is performed every day.
 Firstly, the service hose connections to an air conditioning system are
checked and to see whether the service connectors are installed.
 If pressure is still in the hoses, it causes an error. If the service hoses
are full, a refrigerant analysis is performed and the refrigerant is then
recycled if the "Analysis OK" message appears. Afterwards, the
vacuum test is performed. Several parts of the unit are evacuated.
Once the vacuum test has been carried out successfully, the parts of
the unit are filled with refrigerant – now a 6 minute pressure test is
done with all the solenoid valves open to immediately determine a
drop in pressure. After successful completion, the refrigerant is
suctioned off and the unit is available for service work.
7.2

Setting up and switching on

1. Wheel the AirConServiceCenter to the workplace and lock the front
wheels (12).
I
NOTE
During operation, the unit must be on a level, flat surface so that
measurements can be made correctly.
2. Connect the AirConServiceCenter to the mains.
3. To switch it on, set the main switch (23) to I.
The switch-on delay runs for 35 seconds and the housing is venti-
lated. The software version number then appears in the display (7)
for several seconds:
"SW": Software status
"DB": Database
"SN": Serial number
The following message then appears:
78
WAECO
ASC
5000
R-1234yf
Internal vessel
pressure
Please wait
ASC5000RPA/ASC5500RPA
SW
HF00
DB
P.ZZ
SN
XXXXXX
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Airconservice asc5500rpa

Tabla de contenido