Concealed Duct High Static Pressure
Installation space
Reserve space required for maintenance the indoor unit and service work.
Check port with carrying
in port 600x600
<Installation example>
Air flow direction
REQUIREMENT
1. Attach the optional accessories (drain-up kit etc.) on the unit before installing the unit. Also, set the check port with carrying
in port to the side surface of the unit except air inlet panel.
2. Prepare the check port with carrying in port hole with the size of 600x600mm.
Filter cleaning sign term setting
The lighting term setup of the filter sign (Notification of filter cleaning) of the remote controller can be changed according to the
condition of installation.
For setup method, refer to "Filter sign setting" and "To secure better effect of heating" in the Applicable controls of this Manual.
All manuals and user guides at all-guides.com
Concealed duct high
static pressure
Concealed
duct high static
pressure
Air outlet chamber
Duct hose
– 10 –
200 or more Servicing space
1000 or more
Air flow direction
Filter chamber
Air inlet chamber
Duct hose
Duct hose
Installation Manual
(Unit: mm)
EN
10-EN