Kopie von DOK-RESOL-BA00-WW-WR0006K_-NN-P.doc
After parameters have been edited, the following display appears:
(meaning:"user defined grid monitoring")
4.2 Starting up the Inverter for the First Time
•
•
The inverter is supplied with voltage.
Configure the inverter based on the following dialogs.
First startup
Key
OK
Language selection
Key
▲▼
OK
30
Connect the line voltage (fuse).
Set the knob-operated switch to 1.
Function
Start configuring this inverter.
Function
Select the desired language.
Apply the language selected.
Copyright REFU Elektronik GmbH