n 7KM2200-2EA30-1EA1 (without MID ap-
proval)
n Direct measurement (up to 65 A)
n 7KM2200-2EA40-1JA1 (with MID approval)
n 7KM2200-2EA40-1EA1 (without MID ap-
proval)
2. Phoenix EEM-MB371-EIP 2907976:
This energy meter also allows the direct connection
of Rogowski coils. The energy meter must be con-
figured as a Modbus TCP slave.
3. Kostal Smart Energy Meter 10507524:
This requires the setting "Modbus TQ EM300-LR
(TCP)" in the web interface (parameter "Meter con-
figuration (Second)"). The energy meter also must
be configured as a Modbus TCP slave.
4. TQ Energy Manager EM 420-LLRR:
This requires the setting "Modbus TQ EM410/
EM420 (TCP)" in the web interface (parameter
"Meter configuration (Second)"). The energy meter
also must be configured as a Modbus TCP slave.
Installation and networking
Networking between the energy meter and the
charging station takes place via a direct connection
or via a switch / router.
The external energy meter can be placed in such a
way that only the external consumers are measured
or that the external consumers and the charging
station(s) are measured.
30
Energy meter measures external consumers only
LP1
DLM Master
Fig. 14: Energy meter measures external consumers
only
DLM Master: Charging station that takes on the co-
ordination function in dynamic load management
(DLM).
Switch / router
Meter
Fuse F2
Fuse F3
Main
meter M1
Main fuse F1
Electrical network
M2