The value by which the upper current limit is re-
duced as soon as the digital input is energised can
be checked in the menu "Dashboard" > "DLM
Status" under "Overall Current Applied [A]".
Configuration of the digital input on the Siemens
7KM2200 energy meter (TCP)
The F1, F2, F3 and F4 keys on the energy meter are
needed to select the required "On/Off-Peak" set-
ting.
u Press the F4 key to open the menu.
u Press the F2 key and navigate to "Settings".
u Press the F4 key to open "Settings".
u Press the F3 key several times and navigate to
"Integrated I/O".
u Press the F4 key to open "Integrated I/O".
u Press the F3 key and navigate to "Dig input".
u Press the F4 key to open "Dig input".
u Press the F4 key to open "Action".
u Press the F3 key and navigate to "On/Off-Peak".
u Press the F4 key to confirm "On/Off-Peak".
u Press the F1 key 4 times to close the menu.
6.10.3Activate the interface (Modbus TCP server)
for energy management systems
The tasks described in this section may only
be carried out by a qualified electrician.
As of ECU firmware 5.12.x, it is possible for the char-
ging station to be controlled by an energy manage-
ment system.
Information on compatible energy manage-
ment systems and the description of the
Modbus TCP interface (Modbus TCP Re-
gister Table) can be found on our website:
https://www.chargeupyourday.com/service/
compatible-systems-and-interfaces/
u Navigate to the menu "Load Management" >
"Modbus" and set the following parameters:
Parameter
Modbus TCP Server for
energy management
systems
Modbus TCP Server
Base Port
Modbus TCP Server Re-
gister Address Set
Modbus TCP Server Al-
low Start/Stop Transac-
tion
Modbus TCP Server Al-
low UID Disclose
If each charging station is to be controlled separ-
ately by an energy management system, the inter-
face must be activated in the web interface of each
charging station.
If the entire charging point network is to be con-
trolled by an energy management system, the inter-
face only needs to be activated in the web interface
of the DLM Master.
6.10.4Activating the interface (EEBus) for energy
management systems
The tasks described in this section may only
be carried out by a qualified electrician.
As of ECU firmware 5.22, it is possible for the char-
ging station to be controlled by an energy manage-
ment system via EEBus.
Setting
u Select "On".
TCP port number on
which the Modbus TCP
socket accepts connec-
tions.
u Select "MENNEKES".
u Select "On".
Setting to determine
whether the energy
management system is
allowed to read out the
UID of the RFID card of
the current charging
process.
EN
33