11.4
Selecting direction of aperture
hand side (seen from the inspection hatch side) - and equipped with pre-
installed springs.
Whenever corrective actions are carried out, pay the utmost attention when
releasing, locking or moving the internal mechanical parts. These
operations could be hazardous for the installer.
For left hand installations:
1.
2.
3.
4.
5.
BARRIER INSTALLED ON THE RIGHT (SEEN FROM THE INSPECTION HATCH SIDE)
8
AND THE BOOM OPENING/CLOSURE GATE ON THE LEFT
RIGHT
BARRIER INSTALLED ON THE LEFT (SEEN FROM THE INSPECTION HATCH SIDE)
AND THE BOOM OPENING/CLOSURE GATE ON THE RIGHT
24
7
INSTALLATION
ON THE LEFT
180°
INSTALLATION
ON THE RIGHT
LEFT