6.1 Removing the Filter Cartridge
•
Switch off the power supply of the terminal equipment (remove plug).
•
Close the inlet valve
•
Place the fl ush hose in a bucket and remove pressure from the fi lter system by
opening the fl ush valve. Catch the escaping water in a bucket.
•
Note:
If the escaping water is more than 1 litre, the inlet value (6) is not completely
closed or is blocked with scale.
•
Stand on the kick loops
vessel lid
as far as it will go. The fi lter cartridge
mantle handle
•
Place the pressure vessel lid
•
Stand on the kick loops
vessel
•
Take your feet off the kick loops
down with both hands on the mantle handle
•
Remove used fi lter cartridge
•
Place the used fi lter cartridge
drainage (> 5 min).
•
Lock the used fi lter cartridge
cartridge and return in the original packaging to the appropriate BRITA address listed
on the back of the cover.
6.2 Inserting the Filter Cartridge
•
Check the O-ring seal of the new fi lter cartridge
for dirt and damage. Note: The cartridge seat has been lubricated with a food-safe
lubricant at the factory.
•
Check the connector seat of the fi lter cartridge O-ring
pressure vessel lid
•
Place new fi lter cartridge
•
Stand on the kick loops
turning it clockwise until the mantle handle
loops
•
Stand on the kick loops
vessel lid
marking on the lid handle
•
Press the pressure vessel lid
lock engages
•
Switch on power supply to the terminal device (plug).
•
Execute the steps described under 5.3 to fl ush and bleed the new
fi lter cartridge
18
at the inlet hose
6
5
9
by pressing the locking
3
.
11
9
anti-clockwise by the mantle handle
1
from the pressure vessel
2
in the sink with the connection facing down for
2
with the transport protection cap
2
for dirt and damage.
3
9
.
9
9
on the pressure vessel
3
.
8
.
2
.
with both feet while opening the pressure
and turning it anti-clockwise
8
is released by pressing on the
2
vertically on the lid handle
3
with both feet while turning the pressure
and press the pressure vessel
9
11
.
1
for correct seat in the groove, and
2
in the pressure vessel
2
with both feet, lift the pressure vessel
11
with both feet and place the pressure
. The positioning of the arrow
1
must line up with the "INSERT" groove.
14
down and turn clockwise until the
3
.
14
as far as it will go.
11
.
of the new fi lter
12
in the
2
.
1
is over the kick
1
1