Descargar Imprimir esta página

EAS ELECTRIC EINSOLAR3V Manual De Usuario E Instalacion página 25

Ocultar thumbs Ver también para EINSOLAR3V:

Publicidad

Idiomas disponibles

Idiomas disponibles

7.3 Display and Control Logics
When inverter starts up and operates, there is a control button beside LCD
Display of the inverter. Please follow the logics listed below.
System Loading...
Manufacturer
Wait system
loading
Running
Pac=xxxxxW
short press
E-Today=xx.xkWh
Pac=xxxxxW
short press
E-Total=xxxxx.xkWh
Pac=xxxxxW
short press
Upv=xxx.x/xxx.xV
Pac=xxxxxW
short press
Ipv=xx.x/xx.xA
Pac=xxxxxW
short press
Uac=xxx.xV
Pac=xxxxxW
short press
Iac= xx.xA
Pac=xxxxxW
short press
Fac=xx.xxHz
Pac=xxxxxW
short press
Set Safety
Pac=xxxxxW
short press
Set Language
Pac=xxxxxW
short press
Set Modbus Addr
Pac=xxxxxW
short press
Ver:V1.0.0.00
Pac=xxxxxW
short press
Serial Number
Pac=xxxxxW
short press
long press 2S
Safety Type
short press to
long press 2S
AS 4777.2
select Safety
long press 2S
Language Select
long press 2S
English
long press 2S
Modbus Addr:
long press 2S
x
18
8. DISCONNECTING FROM VOLTAGE SOURCES
Before proceeding any operations on inverter, please disconnect the
inverter from all voltage resources as described in this manual.
Following these steps in described sequence are mandatory.
1.
Disconnect miniature circuit-breaker and prevent from unintentional
reconnections.
2.
Open the DC switch and prevent the switch from closing
unintentionally.
3.
Use clamps to ensure there is no electrical current in DC wires.
4.
Disconnect all DC connections and resources. Unplug the DC
connectors, and DO NOT pull the cables.
5.
Use multimeter to ensure the voltage on DC terminals of inverter is 0.
6.
Unscrew and remove the AC connector.
Danger to life due to high voltages.
Inverter capacitors need 5 minutes to be completely de-
energized. When an error occurs, DO NOT remove the cover of the
inverter onsite. Improper operations and attempts may induce
electric shock.
V.2
19
V.2

Publicidad

loading