Clarke US 1500 Manual Del Operador página 9

Ocultar thumbs Ver también para US 1500:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

How to Put the Machine in Storage
WARNING:
Always remove the electrical
plug from the electrical outlet
before installing or changing the
bag.
To put the machine in storage, follow this procedure:
1. Put the handle in the vertical position.
2. Disconnect the power cord from the electrical outlet.
3. Pull the handle to the floor so that the pad is exposed.
4. Check the pad.
5. Remove or replace the pad if worn or dirty.
6. Put the machine in the verticle position.
7. Wind the power cord around the handle and cord wrap.
8. Depress the handle release lever and fold the handle
horizontally across the motor.
9. Tilt the machine so that it sits on its rear wheels and
link arms. See figure 5.
NOTE: Do not store the machine resting on the
pad driver, the pad driver will warp and cause
vibration.
Inspection and Repairs
Take the machine to the nearest Clarke authorized repair
location once a year for the maintenance inspections.
To make any repairs, take the machine to the nearest
Clarke authorized repair location.
WARNING: Maintenance and repairs
must be done by authorized
personnel only
Clarke
®
Operator's Manual (EN) - Ultra Speed Burnisher
ENGLISH
Figure 5
EN
- 9 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Us 1500dcUs 2000dc

Tabla de contenido