Descargar Imprimir esta página

nVent RAYCHEM SC-JBE-L-A Instrucciones De Instalación página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

5
• Lightly score inner jacket around and
down as shown.
• Peel off inner jacket.
7
• Pull heating cable back into stand as shown.
Use cable lubricant if needed.
8
• Fasten stand to pipe. Do not pinch heating cables.
• Loop and tape extra heating cable to pipe.
5 in.
(127 mm)
6
• Remove 3/4-inch (20 mm) insulation and
fiberglass braid from end of each conductor.
3SC heating cable shown.
Pipe strap
Glass cloth tape
3/4 in.
(20 mm)
Fiberglass
braid (only for SC, SC/H)
1-1/2 in.
(38 mm)
WARNING: Fire and Shock Hazard.
To prevent cable damage and shorting,
position pipe straps under the heating
cable. Ensure the cable does not cross
over itself.
nVent.com/RAYCHEM | 3

Publicidad

loading