STEP 5
8
Elastic with Ball (x24)
16th
STEP 6
7
Pad with Net (x1)
Following the pattern below and beginning with the 7th band, continue to
place the elastic bands around the frame in a clockwise direction until all 24
bands are used. It will get tight as you near the end of attaching the stretch
bands and wearing gloves will come in handy at this point to prevent blisters.
Make sure the balls on the elastic bands are located on the underside of the
trampoline. After all the elastics have been placed, if the mat is not in the
middle of the frame, spend time adjusting the stretch bands.
17th
10th
9th
15th
Lay the pad with net (7) on the frame. There are premade slits in the pad.
Adjust the position of the pad so that the premade slits are directly above
the legs. Insert the top of the legs into the slits of the spring pad.
Pull gently at the seams of the spring pad to find the holes. Insert the top
of the legs into the slits of the spring pad and place the spring pad onto the
frame.
Seam
11th
18th
19th
8th
9
12th
13th
20th
7th
14th