Descargar Imprimir esta página

Part 5: Apply Joint Compound; Part 6: Apply Trim - Ketra D3 Serie Guia De Instalacion

Publicidad

Idiomas disponibles

Idiomas disponibles

I N S TA L L AT I O N

Part 5: Apply Joint Compound

Note: Skip this section if you have a flangeless millwork installation.
1.
Apply skim coat up to the aperture rim using a joint compound. (For flangeless mud-in versions, cover
the flange but not the retainer.) For best results, use a full ceiling float (see fig. 10).
fig. 10
2.
Sand and finish the final surface before removing the aperture plug. Clean the internal surfaces of the
trim retainer with a clean rag and isopropyl alcohol.

Part 6: Apply Trim

Flangeless mud-in and flanged downlights have different processes for applying their trims. Please read
only the appropriate section below.
1.
Applying trim to flangeless mud-in downlight
a.
Press the flangeless trim into the trim retainer (see fig. 11).
fig. 11
P/N 3662708 Rev A
© 2019-2022 Ketra, Inc. All rights reserved.
D3 INSTALLATION GUIDE | 15

Publicidad

Solución de problemas

loading