Power Supply

DANGER
Risk of serious injury or death due to electric shock.
If live parts are touched, there is risk of life-threatening injuries.
Ensure that all phases of the mains power supply to the product are
disconnected prior to installation.
Ensure that the system is secured and cannot be reactivated by other
persons.
Ensure that installation work for the electric connection of the device is
carried out by an electrician, and in compliance with electrical
engineering regulations.
All electric connections between control unit and expansion vessel are pre-
installed.
1.
Connect the mains plug to the 230 V power supply.
2.
Activate the system.
The electrical connection is completed.
6.5.1

Terminal diagram

Item
Terminal
Signal
no.
number
1
GND
RS485 interface for Modbus RTU or
1
2
A
proprietary Reflex protocol
3
B
4
P3
External make-up request
2
With the Levelcontrol setting.
5
P4
Input 230 V signal via L+ N
6
WM1
3
---
7
WM2
8
K1
Contact water meter
4
Digital input
9
K2
10
24 V
Filling level measurement
5
11
INP
Analogue input 4-20 mA
12
GND
13
WM1
6
---
14
WM2
15
24 V
Pressure sensor
7
16
INP
Analogue input 4-20 mA
17
GND
18
GND
19
24 V
8
---
20
OUT
21
AIN
22
N
9
Make-up request 230 V
23
M3
24
N
10
Solenoid valve on the air side
25
M2
26
C
Potential-free group alarm contact
11
27
NC
(max. 230 V / 8 A)
28
NO
29
N
12
Compressor/relief valve
30
M1
Function
Wiring
On-site,
optional
On-site,
optional
---
On-site,
optional
Factory
---
Factory
---
On-site,
optional
Factory
On-site,
optional
Factory
Reflexomat XS — 02.16.2022 - Rev. A
Item
Terminal
Signal
no.
number
31
PE
Earthing
13
32
PE
Earthing
33
PE
230 V voltage supply via cable with
14
34
N
power plug.
35
L
6.5.2
RS-485 interface
This interface is used to retrieve all controller data and to enable communication
with control centres or other devices.
The following data can be requested:
Pressure and filling level.
Compressor operating states.
Operating states of make-up via solenoid valve.
Aggregate volume of the FQIRA + contact water meter.
All messages,  9.4 "Messages",  23.
All entries in the error memory.
6.5.2.1
Connecting the RS-485 interface
Use a shielded cable to connect the interface to terminals 1 – 6 of the
circuit board in the control cabinet.
For connecting the interface,  6.5 "Power Supply",  21.
When using the device with a control centre not supporting an RS-485
interface (RS-232, for example), you must use a corresponding (on-site)
adapter.
Note!
For connecting the interface use, for example, a cable with these
properties.
LIYCY (TP), 4 × 2 × 0.8, maximum overall bus cable length 1000 m.
6.6

Installation and commissioning certificate

Note!
The installation and commissioning certificate can be found at the end
of the operating manual.
7

Commissioning

Note!
Commissioning and maintenance work must be carried out and
confirmed by specialist personnel or the Reflex Customer Service.
Note!
The app guides you through commissioning  9.1 "Reflex Control
Smart",  23.
7.1

Requirements for initial commissioning

The Reflexomat will be ready for initial commissioning when the tasks described
in the "Installation" chapter have been completed.
The Reflexomat has been located.
The weight measuring cell is connected.
The water-side connection of the vessel to the system circuit has been
established.
The vessel is not filled with water.
The connection pipes of the Reflexomat have been purged and cleaned of
welding residue and dirt before commissioning.
The draining valves of the vessel are open.
The entire system has been filled with water and all gases have been
vented in order to ensure circulation throughout the entire system.
The electrical connection has been created according to applicable
national and local regulations.
7.2

Reflexomat switching points

The "P
" minimum operating pressure is determined by the location of the
0
pressure maintenance system. The controller calculates the switching points for
the "PV" solenoid valve and the "CO" compressor from the "P
operating pressure.
Commissioning
Function
Wiring
Factory
Factory
Factory
" minimum
0
English — 21