Descargar Imprimir esta página

EIBENSTOCK EZR 24 R R/L Instrucciones De Servicio Originales página 16

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

To avoid loosing this locking pins push the round rings, which are already
placed on the spindles, in the groove over the locking pins (picture 3).
In order to remove the stirring rods proceed in reverse order.
Care and Maintenance
Before the beginning of maintenance or repair works you
have to disconnect the plug from the mains.
Repairs have to be carried out only by qualified and due to education and
experience suited personnel.
After every repair the machine has to be inspected by an electric specialist.
Due to its design, the machine needs a minimum of care and maintenance.
The following works have to be carried out regularly:
The power tool as well as the ventilation slots always has to be clean.
During work, please pay attention that no foreign elements get into
the interior of the machine.
In case of failure, a repair has to be carried out by an authorised
service workshop.
Our after-sales service responds to your questions concerning maintenance
and repair of your product as well as spare parts.
EIBENSTOCK's application service team will gladly answer questions
concerning our products and their accessories.
Fig. 2
15
Fig. 1
Fig. 3

Publicidad

loading