Descargar Imprimir esta página

Installation; Installation Requirements; Unit Window Installation; Internal Fixing Of The Unit - BONAIRE 2800 Manual Del Propietário

Publicidad

Idiomas disponibles

Idiomas disponibles

Bonaire Window Cooler

Installation

Installation Requirements

Tools
Drill (Power or Cordless)
Adjustable Wrench.
Phillips Head Screw Driver
Drills for drilling pilot holes into window /wall frame
screw used.
Materials Required (Not supplied)
Materials for sealing gap in window
Length of
(6mm) copper or plastic tubing
Sillcock Valve - for water line connection to faucet (see pg. 12)

Unit Window Installation

The unit is ready for installing into your window/wall.
Please follow the instructions for a correct product assembly.
DO NOT connect the power to the cooler until the installation is complete.

Internal Fixing of the Unit

Introduce the grill of cooler through window. Ensure cooler is fixed rigidly to house structure.
Close the window against the unit. Measure the gap of the leftover window opening & then cut and
fit an in-fill panel to seal this gap (materials not provided). Seal any gaps with silicone.
Check that the unit is still level using spirit level on top edge of Rear Filter Panel.
Ensure that the cooler is now fixed rigidly to the house structure.
(6 mm) Drill
or appropriate for size of
7
Page

Publicidad

loading