Operation
5
Operation
5.1
Installation instructions
Before installation, please note the device number (SGTIN) labelled
on the device as well as the exact application purpose in order to
facilitate later allocation. You can also find the device number on the
QR code sticker supplied.
Due to the free mains voltage in the device, installation and opera-
tion may only be carried out by trained electricians who are author-
ised to do so based on their training. `The relevant safety and VDE
regulations must be observed.*
Incorrect installation can endanger
•
your own life,
•
and the lives of other users of the electrical system
Incorrect installation also means that you risk serious damage to
property, e.g. due to fire. You risk personal liability for personal inju-
ry and property damage.
Consult an electrician!
*Specialist knowledge required for installation:
The following specialist knowledge is particularly important during ins-
tallation:
•
The "5 safety rules" to be used: disconnect from mains; safegu-
ard from switching on again; check that no voltage is present in
system; earth and short circuit; cover or cordon off neighbouring
live parts;
•
Select suitable tool, measuring equipment and, if necessary, per-
sonal safety equipment;
•
Evaluation of measuring results;
•
Selection of electrical installation material for safeguarding shut-
off conditions;
32