Descargar Imprimir esta página

Jacuzzi Chelsea Projecta Manual De Instalación - Uso - Mantenimiento página 18

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 50
It is advisable to turn the deviator to the "foot nozzle" position.
(please see the chapter on "Electrical Safety").
-
bath is interrupted and the boiler will not be emptied. When the
power is restored, it is advisable to allow the shower enclosure to
power up for at least two minutes.
sures. A considerable difference in pressure may prevent correct and
speedy adjustment of the water temperature.
-
-
-
-
18
18
-

Publicidad

loading