Descargar Imprimir esta página

Roger Technology BIONIK8 Instrucciones Y Advertencias Para El Instalador página 29

Ocultar thumbs Ver también para BIONIK8:

Publicidad

11.4
Selecting direction of aperture
right hand side (seen from the inspection hatch side).
Whenever corrective actions are carried out, pay the utmost
attention when releasing, locking or moving the internal mechanical
parts. These operations could be hazardous for the installer.
1.
2.
3.
4.
BARRIER INSTALLED ON THE RIGHT (SEEN FROM THE INSPECTION HATCH SIDE) AND THE
8
BOOM OPENING/CLOSURE GATE ON THE LEFT
BARRIER INSTALLED ON THE LEFT (SEEN FROM THE INSPECTION HATCH SIDE) AND THE
BOOM OPENING/CLOSURE GATE ON THE RIGHT
7
INSTALLATION OF
THE LEFT
INSTALLATION
ON THE RIGHT
29

Publicidad

loading

Este manual también es adecuado para:

Bi/008Bi/008/115