For vertically-fixed probes, the metal plate
fixing hole must be placed high up.
• To detect a water level of 2 mm, the
bottom of the plate must be fixed 1 to 2
cm from the ground.
• To detect a water level above 2 mm, raise
the metal plate to the required height.
• Fix the metal plate using a suitable fixing
screw.
• Position the magnetic probe on the metal
plate.
Note: the probe can be removed to
simplify maintenance. We recommend you
clean it regularly to avoid dust from building
up between the probe and the ground.
F
REEZER BREAKDOWN PROBE
Probe.
Connecting cable.
Bushing groove.
• Open the freezer and place the probe
among the frozen food.
• The bushing supplied with the
accessories can be used to limit the risk
of cold loss.
• Slide the cable in the bushing groove and
stick the bushing to the freezer seal.
Bushing.
Freezer seals.
151