6
Using the 24mm fixed spanner and the tubular socket wrench, screw the upper nut again until it contacts the lower nut
in order to lock it, as shown in the image (1). Repeat the process on the opposite side, as shown in the image (2).
Image (1)
Separating the rollers
7
Using a 24mm fixed spanner and the tubular socket
wrench, unscrew and remove the upper nut as
shown in the image (1). Repeat the process on the
opposite side, see image (2).
Imagen (1)
9
Using the 24mm fixed spanner and the tubular socket
wrench, screw the upper nut again until it contacts
the lower nut in order to lock it, as shown in the image
(1). Repeat the process on the opposite side, see
image (2).
Imagen (1)
11
Fix the front fairing by screwing the 4 side knobs, as
shown in the next image .
21
Image (2)
8
Imagen (2)
10
Imagen (2)
12
Connect the machine to a power supply to operate it
again.
Using the 24mm fixed spanner, and the tubular
socket wrench, screw the lower nuts as shown in
the image (1). Look at how the rollers move apart in
the image (2).
Imagen (1)
Once the rollers have been adjusted, reassemble the
front fairing of the MB Bucker 500.
Imagen (2)