Descargar Imprimir esta página

Master MB Bucker 500 Manual De Uso Y Mantenimiento página 26

Ocultar thumbs Ver también para MB Bucker 500:

Publicidad

Idiomas disponibles

Idiomas disponibles

PIN
Until the front fairing is repositioned correctly and the pin is inserted into the base, the machine will not switch on and
will not be operational. This avoids exposing the operator to any risk of traction trapping by the rollers.
IMPORTANT: Always remember to correctly fix the front fairing of the machine by tightening the four side knobs as
shown in the following images.
Maintenance
Cleaning
Correct maintenance of the equipment is essential for a good result. Follow the following disassembly and cleaning
steps shown below.
25
BASE
PIN
BASE

Publicidad

loading