Cembre CPE-1 Manual De Uso Y Mantenimiento página 9

Bomba electro-hidraulica
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.1) Topping up the hydraulic oil
Periodically check, at least every 6 months, the oil level in the pump.
– Position the pump on its base on a fl at surface.
– Completely discharge the oil pressure by pushing the pressure release button (PS).
– Remove cap (TL) and check the level of the oil, if necessary slowly add oil.
NEVER REFILL OVER THE MAXIMUM LEVEL to leakage during operation.
– When refi lling is fi nished replace the cap (TL).
Should it be necessary to remove oil from the reservoir, drain by removing the cap with magnetic
insert (TV) (Fig. 7) located on the bottom of the pump.
Clean cap (TV) of any metallic deposits before replacing it.
Always use clean recommended oil, see § 1.
Do not use old or recycled oil.
Do not use hydraulic brake fl uid.
Ensure that used oil is disposed of in accordance with current legislation.
5.2) Protection fuses
The pump is equipped with two protection fuses:
F1: fuse 10A (5X20) for protection of
electric motor
F2: fuse 2A (5X20) for protection of
24V control circuits.
In case of replacement, use only
equivalent fuses.
5.3) Internal electrical panel components
C
450V 16μF MOTOR RUNNING CAPACITOR
C1
450V 40μF MOTOR STARTING CAPACITOR
EV
24 V DC OIL RELEASE VALVE
PR
24 V DC PRESSURE SWITCH
RC
CURRENT RELAY
R
6,8 K CONDENSER DISCHARGE RESISTOR
SE
ELECTRONIC CARD
TL
OPERATING RELAY
TR
TRANSFORMER
9
(Ref. to Figs. 7 and 8, page 36)
(Ref. to Fig. 8, page 37)
PS
F1
ENGLISH
F2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cpe-1-110Cpe-1-mgCpe-1-110-mg

Tabla de contenido