Descargar Imprimir esta página

KNF LABOPORT SC820G Manual De Instrucciones página 150

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 326
Setup and connection
42
8.1 Preparing for commissioning
Ensure the following points before switching the vacuum sys-
tem on:
Necessary operating requirements
Vacuum
- Connect all hoses correctly
system
(see Chapter Connecting the pump [} 45])
Vacuum
- Data of the voltage supply system are consis-
system
tent with the details on the type plate of the vac-
uum system.
- Vacuum system outlet is not closed or re-
stricted.
- When operating with gas ballast:
When venting the pump through the air inlet, no
explosive or poisonous mixtures can occur.
Vacuum
- Collection flasks correctly mounted (with flask
system
clamps).
(see Chapter Connecting the pump [} 45])
Vacuum
- Signal cable plugged in
system
(see Chapter Connecting the pump [} 45])
Vacuum
- USB Bluetooth sticks are correctly plugged
system
into the vacuum controller and the vacuum sys-
tem (separator)
(see Chapter 8.4 Connecting the vacuum con-
troller to the vacuum system [} 50])
Vacuum
- Charging cradle connected to the power
system
adapter
Tab.19: Operating requirements for commissioning
Translation of Originial Operating Instruction, KNF 339416-339418 02/23
Vacuum system SC820G / SC840G

Publicidad

loading

Este manual también es adecuado para:

Laboport sc840g