ENGLISH
PHASE 1 : WATER LOADING
As first operation, the tool loads the tank (W)
with tap water by opening the charge valve
2.5 min
(G) to allow flow to the nozzles (Z) located
on the lid.
(con P
= 2.5
ingresso
bar)
Water is loaded until the probe (located
inside the level gauge block (Q)) reaches the
maximum level (6L) : the control board then
closes the charge solenoid valve.
16