Note:
Wear safety glasses while conducting
this work.
Reference table of the original material
and the result according to the use of each
sieve made available in the equipment
according to the model
0.8 mm
3 mm
Assembly of grain feeder
Model TRF 50 and TRF 80F
Place the grain feeder (1) over the green crop feeder (2),
secure it with screw (3), washer (4) and tighten with nut
(5) through the internal part of the green crop feeder (2).
Note:
It must be conducted with the
machine off.
1
3
4
46
5 mm
12 mm
Flat strainer
2
5
Other models
Mount the grain funnel (1) by attaching it to the
green crop funnel (2) according to the following
image, thus, the dry material crushing work can be
performed.
After mounting the funnel, pour the grains intended
to be crushed in the funnel and adjust the material
output opening so as not to overload the motor
during the operation. The material can only be
released from the grain funnel when the motor is in
full rotation, as indicated in page 45.
Turning the motor on with the material inside the
shredder will cause the warranty to be lost.
www.trapp.com.br