ASSEMBLY STEP 5 - REMOVAL OF RED TRANSPORT CABLES
RED TRANSPORT CABLE
5.1 Ensure that treadmill is resting with all wheels supported by the floor.
5.2 On left side of treadmill, use the 5mm L-wrench (provided in box) to
RED TRANSPORT CABLE
5.3 Replace both bolts (one in the upper deck frame and one in the lower base
5.4 Perform same operation on right side of treadmill to remove the two bolts
5.5 Replace both bolts and fully tighten to lock in place.
5.6 Save both red transport cables for future use by placing cables into clear
5.7 When red transport cables are not installed, transport unit ONLY on the
WARNING
FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN
INJURY!
Once the red transport cables have been detached from the treadmill,
high pressure springs can cause the lower base frame to spring open.
NEVER tip treadmill upside-down or on its side, and NEVER lift this unit
if red transport cables are not connecting the upper deck frame to the
lower base frame.
remove the two bolts connecting the red transport cable to the upper deck
frame and the lower base frame.
frame) and fully tighten to lock in place. Note that to prevent the lower
base frame from springing open during transport or disassembly of the
treadmill in the future, the red transport cable can be reattached to the
treadmill using these same bolts.
connecting the red transport cable to the upper deck frame and the lower
base frame.
poly bag alongside the owner's manual.
ground, and ONLY after it is fully assembled and in the upright folded
position with the lock latch secured.
15