Descargar Imprimir esta página

Ferroli ENERGY TOP B Serie Instrucciones De Uso, Instalación Y Mantenimiento página 72

Ocultar thumbs Ver también para ENERGY TOP B Serie:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 22
Condensate outlet connection using two or more generators
2
fig. 49 - Condensate drain connection with several generators
A
Place the Ø40 pipe 1 (not supplied) on the side of the generator
B
Slide the pipe 2 (of each generator) towards the arrow side at least 2-3 cm in
order to insert it in the pipe 1.
4. SERVICE AND MAINTENANCE
All adjustment, conversion, startup and maintenance operations described below must
only be carried out by Qualified Personnel (meeting the professional technical require-
ments prescribed by current regulations) such as those of the Local After-Sales Techni-
cal Service.
FERROLI declines any liability for damage and/or injury caused by unqualified and un-
authorised persons tampering with the unit.
4.1 Adjustments
Gas conversion
The unit can operate on natural gas or LPG and is factory-set for use with one of these
two gases, as clearly shown on the packing and on the dataplate. Whenever a gas dif-
ferent from that for which the unit is arranged has to be used, a conversion kit will be re-
quired, proceeding as follows:
1.
Disconnect the power supply to the boiler.
2.
Using the special key supplied, open the cabinet of the upper exchanger body.
3.
Detach the electrical connections from the gas valve controller.
4.
Loosen the gas valve (fig. 50 e fig. 51) fixing ring "A".
5.
Undo the two fixing screws "B" and remove the fan assembly as indicated in fig. 50
for the model ENERGY TOP B 80 - 160 and in for fig. 51 the model ENERGY TOP
B 125 - 250.
B
fig. 50 - model ENERGY TOP B 80 - 160
fig. 51 - model ENERGY TOP B 125 - 250
72
EN
1
A
B
2
A
B
A
B
B
cod. 3541G011 - Rev. 00 - 07/2015
ENERGY TOP B
6.
Undo the screws "C" and remove fan "D" (fig. 52 - only model ENERGY TOP B 125 - 250)
3
C
fig. 52 - model ENERGY TOP B 125 - 250
7.
Undo the fixing screws "E" (fig. 53 model ENERGY TOP B 80 - 160 and fig. 54
model ENERGY TOP B 125 - 250) and remove the gas valve.
fig. 53 - model ENERGY TOP B 80 - 160
E
G
fig. 54 - model ENERGY TOP B 125 - 250
8.
Replace the gas nozzle "F" (see fig. 53 for the model ENERGY TOP B 80 - 160 and
fig. 54 the model ENERGY TOP B 125 - 250) with the one contained in the con-
version kit, positioning it inside the seal "G" . Refit the parts and check their tight-
ness.
9.
Modify the parameter for the type of gas:
put the boiler in standby mode
press the DHW buttons (details 1 and 2 - fig. 1) at the same time for 10 sec-
onds: the display shows "P01" flashing.
Press the DHW buttons (details 1 and 2 - fig. 1) toset parameter 00 (for use
with natural gas ) or 01 (for use with LPG).
press the DHW buttons (details 1 and 2 - fig. 1) together for 10 seconds. The
boiler will return to standby mode
10. Apply the label, contained in the conversion kit, near the dataplate.
11. Using a combustion analyser connected to the boiler fume outlet, make sure the
CO
content in the fumes, with the boiler operating at max. and min. output, com-
2
plies with that given in the technical data table for the corresponding type of gas.
D
2
3
1
2
C
1
C
F
G
E
F

Publicidad

loading