8
INSTALLATION
5. Once the Gray Power Supply Adapter (5) is touching the Clear Quartz
Sleeve Module (7), tighten Gray Power Supply Adapter (5) into Clear
Quartz Sleeve Module (7). Hand Tight Only.
6. Hold onto the cable (3) and tighten the Watertight Cord Connector (4)
until cable is secured.
7. Tighten Black View Port Cover (6) until it makes contact with the Clear
Quartz Sleeve Module (7).
NOTE: If retrofitting the Black View Port Cover (P/N 960536) replaces
Black Nut.
Power Cord Adjustment
The lamp spacer (8) is provided to ensure the proper distance (4" Space
between 4-Pin (2) and Gray Power Supply Adapter (5)) is maintained for
the UV lamp. The proper positioning is important for UV effectiveness.
1. The 3/8-inch Threaded Watertight Cord Connector (4) is adjustable.
Loosen it gently move the cord through it. Care must be taken when
retightening. If the Connector' s Rubber Gasket Seal is dislodged
during cord adjustment please make sure that it is properly re-seated
inside the male threaded portion of the connector.
A minimum 4-inch distance must be maintained between
the Gray Reducer (5) and the white 4-pin Lamp Connector (2).
DO NOT REMOVE THE LAMP SPACER, ITEM #8!
OPERATION
Initial Start-Up
1. Verify the black nut for the quartz sleeve module is secure.
2. If in vertical position loosen air bleed valve to allow air to escape the
unit and drain plug is secured.
3. Turn on pump.
4. Close the air bleed valve once a steady stream of water emerges.
5. Energize UV system ballast.
a. The ballast will delay the UV Lamp from illuminating for 25
seconds.
b. The 25 second delay is activated by either a manual power on or
a flow switch trigger.
6. Check the UV Lamp for illumination via the view port at either end of
the unit.
7. Once the UV Lamp is illuminated and there are no leaks the startup
is complete.
8. The flow switch will control the UV lamp during flow and low flow
conditions.
BIOSHIELD® UV SYSTEM Installation and User's Guide
2. After a successful leak test and without the power supply connected
to a control box, attach the lamp' s 4-pins to the power cord' s white
4-pin Connector. Then slide the UV lamp back into the quartz sleeve.
3. Care must be taken when installing the UV lamp into the vessel' s
quartz sleeve. Vertical installations require extra attention to
eliminate the chance of the lamp dropping into the quartz sleeve and
breaking.
4. With the UV lamp/power cord connection complete and the lamp
entirely inside the quartz sleeve, carefully tighten down the Gray
Power Supply Adapter (5) onto the Clear Quartz Sleeve Module (7)
hand tighten only.
5. Tighten down the Black View Port Cover (6) (P/N 960536) until it
makes contact with the Clear Quartz Sleeve Module (7).
NOTE: If you do not have the Black View Port Cover (6) back far enough
before tightening the Gray Power Supply Adapter (5), the gray adapter
will not make contact with the power supply gasket and will enable
outside moisture to enter the quartz sleeve assembly and cause a
system failure.
System Flow Rate Trigger Points
2.5" Schedule 40 Tee
Off Trigger
11 GPM
This filter operates under pressure. With the valve
clamped properly and operated without air in the sys-
tem, this filter will operate in a safe manner. Air entering
the filter and the valve not clamped correctly can cause
the valve to separate, which could cause serious per-
sonal injury and/or property damage.
Always turn pump off before changing valve positions.
Changing valve positions while the pump is running can damage the
control valve, which may cause serious injury or property damage.
On Trigger
19 GPM