2.1 Control panel
EMP-200
EMP-500
EMP-1500
REFRIGD
1
2
3
1. Knob to turn on pump.
2. Knob to turn on compressor.
Turn on the equipment with the main switch, then turn on the pump, then the compressor, it
can not turn on if the pump is not turned on.
When you finish using the equipment, first turn off the compressor, then the pump and finally
the main switch.
2. Operation
EFROST
SET
EMP 3000
4
3. Main switch.
4. Piston ignition selector button for the
movement of the molds.
Instalation
BOMBA
COMPRESOR
PISTÓN
51