fig. 5
return
V
M
F
F
screw
screw
fig. 6
C
D
cold H
O
2
hot H
O
2
fig. 7
fig. 8
INSTALLATION
RW KIT
Attach the delivery pipe (M) to the hydraulic kit using the 3/4"
seal supplied.
Connect the boiler stove delivery pipe to delivery pipe (M) on
the hydraulic kit, inserting the 3/4" seal supplied and screwing
them together with care (fig. 5).
G G
Insert the boiler return pipe into the O-ring and couple it to
the connection on the body of the circulator located on the kit,
securing it with the special clip (fig. 5).
delivery
Connect the flexible pipe of the expansion vessel to the V-
fitting of the hydraulic kit (see Fig. 5)
Insert the two teeth (F) of the kit support into the two slots (G)
inside the boiler base.
Connect the manometer capillary to the appropriate fitting on
the hydraulic kit and fasten it with the clip provided (see fig. 8).
Use the screws provided to fasten the kit support to the rear of
the boiler (fig. 6).
N.B.: Complete the operation by tightening the elbows con-
nected to the kit, if required (delivery/return/H
RW2 KIT
To assemble the kit, proceed as above.
Affix the metal support to the rear of the boiler, using screws
(C - Fig. 7). This supports the plate exchanger and the protec-
return
tive casing (D - fig. 7).
Connect the two flexible pipes supplied, from the plate ex-
delivery
changer, to the hydraulic delivery and return connections on the
previously installed hydraulic kit (see pages 25-26).
N.B.: Complete the operation by tightening the elbows con-
nected to the kit, if required (delivery/return/H
capillary
clip
- 24
-
O)
2
O)
2