Descargar Imprimir esta página

Rohde TE Serie Manual De Instrucciones página 43

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72
Step
Action required
4
To do this, loosen the supporting screw on the back.
Now you can lift the floor and place it horizontally on an
5
even surface. Do not place the floor vertically on its side!
Ecotop
Step
Action required
If necessary, you can seperate the kiln stand from the
1
kiln.
Check the tensioning belts of the stainless steel kiln
2
casing beforehand and tighten them slightly if necessary.
3
To do this, loosen the supporting screws on the front.
4
To do this, loosen the supporting screws on the back.
You can now lift off the kiln body and store it upright on
5
a flat surface.
41 / 161 - EN -
Illustration
Illustration

Publicidad

loading

Este manual también es adecuado para:

Te 80 sTe 95 sTe 100 sTe 130 sTe 145 sTe 165 s ... Mostrar todo