Descargar Imprimir esta página

ZYMBO 10HP Manual De Instalación página 27

Publicidad

Idiomas disponibles

Idiomas disponibles

                                                                                                                                  
*The above data could be change without notice in order to improve the  
performances.  
STANDARD TEST CONDITIONS –EN 14511‐ 
OPERATING CONDITIONS IN COOLING AND DEHUMIDIFICATION MODE: 
‐Inside 27℃ DB, 19℃ WB 
‐Outside 35℃ DB, 24℃ WB 
OPERATING CONDITIONS IN HEATING MODE: 
‐Inside 20℃ DB 
‐Outside 7℃ DB, 6℃ WB 
 
INSTALLATION
2
 
 
2.1 POSITIONING THE AIR CONDITIONER(P3) 
 
To maintain the best performance from your air conditioner, prevent breakdowns or hazards, you 
must position it correctly. Please follow the guidelines and instruction below in full, as failure to do 
so could cause potential installation problems.  
 
‐The air conditioner must be installed on an 
 
exterior  wall  that  has  access  to  the  outside 
 
with  a  minimum  of  a  meters  clearance  to 
 
the outside.  
 
‐The  air  conditioner  must  be  fitted  leaving 
 
room  all  around  as  illustrated  in  the  paper 
 
template.  
 
‐The  wall  on  which  the  air  conditioner  is 
 
installed  must  be  sturdy  and  able  to 
 
withstand the weight of the air conditioner.
 
 
After determining the best place for installation as described above, please check to ensure that 
the wall can be drilled in the chosen area without interfering with other structures or installation 
(beams, piers, pipes, wires, etc.). 
Please also ensure that there are no obstacles on the outside of the wall, which may obstruct air 
circulation through the drilled holes, for example: plants and their leaves, slats or paneling, drain 
pipes, overflows and gratings, etc. Any obstruction could interfere with the correct performance of 
the conditioner.  
 
2.2 PAPER TEMPLATE (P4) 
 
Fasten the template to the wall once the following 
 
guidelines have been thoroughly checked.  
 
 
 
‐Do  not  drill  any  holes  until  you  are  completely 
 
confident  that  there  are  no  obstacles  in  the  area 
 
you  wish  to  drill  and  there  are  no  obstructions, 
 
which  could  be  hidden  by  the  construction  of  the 
 
wall,  for  example:  Electrical  wiring,  water  &  gas 
 
pipes or supporting lintels or beams.  
 
‐Ensure  that  a  spirit  level  is  used,  as  the  air 
 
conditioner must be level.  
 
‐Follow the installation instruction in full.
 
 
 
EN 
P3
P4
6

Publicidad

loading

Productos relacionados para ZYMBO 10HP

Este manual también es adecuado para:

12hp