Commissioning, Operation - WIKA PG23HP Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Transport ... / 5. Commissioning, operation
CAUTION!
Damage through improper transport
EN
With improper transport, a high level of damage to property
can occur.
Packaging and storage
Do not remove packaging until just before mounting.
Keep the packaging as it will provide optimum protection during trans-
port (e.g. change in installation site, sending for repair).
Permissible conditions at the place of storage:
Storage temperature: -40 ... +70 °C
Avoid the following influence:
Mechanical vibration, mechanical shock (putting it down hard)

5. Commissioning, operation

Before installation, commissioning and operation, ensure that the appro-
priate instrument has been selected in terms of scale range, design and
specific measuring conditions.
12
When unloading packed goods upon delivery as well as
during internal transport, proceed carefully and observe
the symbols on the packaging.
With internal transport, observe the instructions in chapter
5.2 "Packaging and storage".
WIKA operating instructions pressure gauge, model PG23HP

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pg23hp-pPg23hp-s

Tabla de contenido