Descargar Imprimir esta página

STOK QUATTRO SGP4130N Manual Del Propietário página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 9: INSTALLING THE WARMING RACK
See Figure 14.
 Fully raise the hood.
 Lay the warming rack in the grooves on each side of the
hood and lock it into the rear pilot holes as shown.
WARMING
RACK
Fig. 14
STEP 10: INSTALLING SIDE SHELVES
See Figures 15 - 16.
To install the utility bar onto the side shelf:
 Line up holes in utility bar with holes under side shelf.
 Insert M5 x 12 mm bolt (MM) through the hole in the
bracket and into the end of the bar.
 On the right side shelf only, place the match stick chain
and washer (EE) between the utility bar and bracket.
 Insert M4 x 40 mm bolt (DD) through the holes and bar.
Slide the lock washer (AA) and washer (CC) onto the bolt.
Securely tighten with hex nut (BB).
To install the side shelf:
 Remove the bottom screw from the spacers on each side
of the firebox.
 Loosen the top screw in the spacers.
ASSEMBLY
 Slide the keyhole slot in the side shelf over the top screws.
 Align the holes in the bottom of the spacer to the bottom
holes in the side shelf.
 Secure using earlier removed screws and tighten the top
screw.
PILOT
HOLE
UTILITY BAR
GROOVES
BRACKET
Fig. 15
SIDE
SHELF
SPACER
Fig. 16
14
MATCH STICK CHAIN
AND WASHER (EE)
(RIGHT SIDE ONLY)
NUT
(BB)
BOLT (MM)
SCREW
LOCK WASHER
(AA)
WASHER
(CC)
BOLT (DD)
SIDE SHELF

Publicidad

loading