Control Panel Symbols; Machine Installation; Uncrating Machine; Installing Batteries - Tennant T3 Manual De Operador

Ocultar thumbs Ver también para T3:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CONTROL PANEL SYMBOLS

Main Power
I/O Key Switch
Slow Speed
Fast Speed

MACHINE INSTALLATION

UNCRATING MACHINE

1. Carefully check the shipping crate for signs of
damage. Report damages at once to carrier.
2. Check the contents list. Contact distributor for
missing items.
Contents:
2--12 V Batteries -- Optional
S
24V Off--board Battery Charger -- Optional
S
2--Foam Battery Spacers (#630375)
S
Battery Tray (#1012994)
S
15 in / 38 cm Battery Cable (#130364)
S
4--Battery Cable Rubber Boots
S
1--FaST--PAK 365 Concentrate (#1017015)
S
(FaST Model)
Squeegee Assembly (#9001178)
S
Pad Driver
S
Brushes and pads must be purchased separately.
3. To uncrate your machine, remove the shipping
hardware and straps that secure the machine to
the pallet. With assistance, carefully lift the
machine off the pallet.
ATTENTION: Do not roll machine off pallet unless
a ramp is used, machine damage may occur.
ATTENTION: To prevent possible machine
damage, install batteries after removing machine
from shipping pallet.
Tennant T3/T3+ (05- -10)
FaST System I/O Switch
(FaST Model)
ec- -H2O System I/O Switch
(ec- -H2O Model)
Brush Motor
Circuit Breaker
Bail Direction
Home
Find... Go To..

INSTALLING BATTERIES

WARNING: Fire Or Explosion Hazard.
Batteries Emit Hydrogen Gas. Keep Sparks And
Open Flame Away. Keep Battery Hood Open When
Charging.
FOR SAFETY: When servicing machine, wear
protective gloves and eye protection when
handling batteries and battery cables. Avoid
contact with battery acid.
Battery Specifications:
Two 12 volt deep cycle lead acid batteries.
105 AH battery -- 17 in / 43cm Brush Assist Model
130 AH battery -- 20 in / 50cm Brush Assist Model
155 AH battery -- 20 in / 50cm Drive Model
Maximum battery dimensions: 6.85 in / 174 mm W x
15 in / 380 mm L x 11.18 in / 284 mm H.
1. Park the machine on a level surface and remove
the key.
2. Lift the recovery tank to access the battery
compartment (Figure 1).
FIG. 1
3. Carefully install the batteries into the battery
compartment tray and arrange the battery posts
as shown (Figure 2). Insert the two foam spacers
along side the batteries as shown.
OPERATION
5% (3°) Maximum
Machine Climb
Solution Flow
Control
Heavy Scrub Brush
Down Pressure
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

T3+

Tabla de contenido