Installation; Lifting Instructions - ESAB Warrior Feed 304 Manual De Instrucciones

Ocultar thumbs Ver también para Warrior Feed 304:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

GB
4

INSTALLATION

The installation must be carried out by a professional.
WARNING
When welding in an environment with increased electrical danger, only power
sources intended for this environment may be used. These power sources are
marked with the symbol
4.1

Lifting instructions

CAUTION
Mounting a large (Ø 440 mm) bobbin change the gravity and tipping and
crushing hazard exists when lifting. Protect yourself and warn bystanders
of the risk!
To avoid personal injury and / or equipment damage, lift using method and
attachment points shown here.
Ordering number for the lifting eye can be found on page 50.
Note! If another mounting device is used, this should be insulated from the wire feed
unit.
bm55d1e
- 36 -
© ESAB AB 2013

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Warrior feed 304w

Tabla de contenido