Descargar Imprimir esta página

ROBLIN GLISS Manual Del Usuario página 23

Ocultar thumbs Ver también para GLISS:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 59
• Open the doors/the door (See section Open Panels).
• Remove the Metal grease filters using the handles provided.
• Adjust the two screws Vr, in the brackets 11a, so that they are
at the start of their travel.
• Hook the hood body to the two brackets 11a.
• From the inside of the hood body, turn screws Vr to level the
hood body itself.
• Fasten the safety screw 12a.
• Close the doors/the door again.
AIR OUTLET DUCTING VERSION
When installing the Ducting version, join the Hood to the outlet
duct using a rigid or flexible pipe ø150 or 120 mm, selection of
which is at the discretion of the installation technician.
• Insert flaps 11b on the Hood Canopy Outlet.
Connecting the ø 150 pipe
• Fasten the pipe using suitable pipe clamps. The materials re-
quired to do so are not provided.
Connecting the ø 120 pipe
• To connect using a ø120 mm pipe, insert the reduction Flange
9 onto the Hood Canopy Outlet.
• Fasten the pipe using suitable pipe clamps. The materials re-
quired to do so are not provided.
• In both cases, any Activated Charcoal Filters must be removed.
RECIRCULATION VERSION AIR OUTLET
To install the Recirculation Version of the hood, the optional Ac-
tivated charcoal cartridge kit must be purchased.
• Screw the filter cover onto the air outlet, using four screws 12c
(2.9 x 12.5).
• Fix the directional grille 8 on the recirculation air outlet using
the 2 screws 12d (2,9 x 9,5) provided.
EN
Fitting the hood body
Connections
11a
Vr
12a
12d
8
12c
16
2
23
3

Publicidad

loading