Descargar Imprimir esta página

Kohler K-2096 Guia De Instalacion página 4

Ocultar thumbs Ver también para K-2096:

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparation (cont.)
Locate the two lavatory anchoring holes, and mark the hole
locations on the finished wall. Now mark the floor through the
hole in the pedestal bottom.
Carefully remove the lavatory from the pedestal. Then move the
pedestal from the area.
1016182-2-B
4
Kohler Co.

Publicidad

loading