Descargar Imprimir esta página

Bosch Purion 200 Instrucciones De Servicio Originales página 12

Ocultar thumbs Ver también para Purion 200:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 27
English – 2
Product Features
The numbering of the components shown refers to the illus-
trations on the graphics pages at the beginning of the
manual.
All illustrations of bike parts except for the drive unit, on-
board computer (including operating unit), speed sensor
and the corresponding holders are a schematic representa-
tion and may differ on your eBike.
(1) On/off button
(2) Display
(3) Ambient light sensor
(4) Select button
(5) Button for increasing assistance level +/
bicycle lights
(6) Button for decreasing assistance level –/
walk assistance
(7) Holder
(8) Diagnostics connection (for servicing purposes
only)
(9) Button to reduce brightness/
go back
(10) Button to increase brightness/
go forward
Technical Data
Operating unit
Product code
Max. charging current of USB
A)
port
A)
USB port charging voltage
B)
USB charging cable 
Charging temperature
Operating temperature
Storage temperature
Diagnostic interface
Internal lithium-ion battery
Protection rating
Dimensions (without fastening)
Weight
Bluetooth® Low Energy 5.0
– Frequency
– Transmission power
A) Specification for charging the Purion 200 operating unit; ex-
ternal devices cannot be charged.
B) Not included with the product as standard
C) USB Type-C® and USB-C® are trademarks of USB Implementers
Forum.
The licence information for the product can be accessed at the follow-
ing Internet address: www.bosch-ebike.com/licences
0 275 007 3RP | (28.02.2023)
Declaration of Conformity
Robert Bosch GmbH, Bosch eBike Systems, hereby declares
that the Purion 200 radio communication unit complies with
Directive 2014/53/EU. The full text of the EU Declaration of
Conformity can be accessed at the following Internet ad-
dress: www.bosch-ebike.com/conformity.
Robert Bosch GmbH, Bosch eBike Systems, hereby declares
that the Purion 200 radio communication unit complies with
the Radio Equipment Regulations 2017 (SI 2917/1206).
The full text of the UK Declaration of Conformity can be ac-
cessed at the following Internet address:
www.bosch-ebike.com/conformity.
Certification information
Certification numbers (e-labels) can be found in the status
screen under <Settings> → <Information> → <Certific-
ates>. Scroll through all e-labels by briefly pressing the
scroll on button (10).
Note: If you wish to access information from the e-label of
Purion 200, you may first have to remove any additional on-
board computer or, if using a smartphone, close the ride
screen in the eBike Flow app.
Operation
Purion 200
Requirements
BRC3800
The eBike can then only be switched on when the following
requirements are met:
mA
600
– A sufficiently charged eBike battery is inserted (see oper-
V
5
C)
USB Type-C® 
– The speed sensor is connected properly (see operating
°C
0 to +45
°C
–5 to +40
Before riding off, ensure that the buttons on the operating
°C
+10 to +40
unit are within easy reach. We recommend that you align the
C)
USB Type-C® 
unit so that the plus/minus button level is perpendicular to
the floor.
V
3.7
mAh
75
Operating unit power supply
IP55
If a sufficiently charged eBike battery is inserted into the
mm
85 × 54 × 60
eBike and the eBike is switched on, then the internal operat-
g
49
ing unit battery is powered and charged.
If the state of charge of the internal operating unit battery is
very low, you can charge it via the diagnostics connec-
MHz
2400–2480
tion (8) with a USB Type-C® cable using a power bank or an-
mW
1
other suitable power source (charging voltage 5 V; charging
current max. 600 mA).
Always close the flap of the diagnostics connection (8) so
that no dust or moisture can enter.
ating instructions for the eBike battery from the system
generation the smart system).
instructions for the drive unit from the system genera-
tion the smart system).
Bosch eBike Systems

Publicidad

loading

Este manual también es adecuado para:

Brc3800