Descargar Imprimir esta página

Hedson Drester ACE Manual De Operación página 9

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 95
This air gun is used to dry the spray gun after the
cleaning procedure.
10. INSTALLATION AND CONNECTION
Raising and lowering the front panel
To raise the front panel:
1. Lift the front panel outward and upward.
2. Raise it evenly and secure it to its brackets.
To lower the front panel, raise it slightly to release
its hooks, tilt it outward and lower it.
231721 Rev. 1 2022-12-01
231721 rev.1 2022-12-01
Drester ACE
Drester ACE
Removing the front panel
To remove the front panel:
1. Lift the panel outward.
2. Tilt the panel to one side.
This releases the rollers from the right/left roller
tracks.
Compressed air
To prevent pressure drops, the air line and
couplings must be adequately dimensioned. The
regulator of this unit is preset to 6.5 bar (100 psi).
This setting must not be altered.
The unit must be connected to compressed air of
7–12 bar (110–180 psi). When in use, the unit uses
150 liters/minute (6 cfm) of air. However, when
the built-in ventilation is operating, the unit uses
450 liters/minute (16 cfm).
The compressed air must be clean and dry
according to ISO 8573-1, Class 3.4.3 or better. Any
pollutions in the compressed air will invalidate any
warranty claims.
Connect the air supply to the 1/4" fitting. The air
line can be routed to this point through the slots
on the side of the unit or through the back of the
unit.
Optional
Note!
Make sure that the air supply hose does not
9

Publicidad

loading