Descargar Imprimir esta página

Kermi Decor V 10 Serie Instrucciones De Empleo Y De Montaje página 6

Radiadores

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 20
Using a fork spanner SW 7 screw the
union nuts SW 30 (3) and the screw-in fit-
tings M 7 (1) together (tightening torque
30 Nm). In doing so, alternatingly tighten
just 1– turns in each case to prevent the
threaded connection part from jamming.
Attach panels (4).
Transport radiator only in a standing position.
Install built-into-wall brackets (see Fig. 1–8)
Observe submersible radiator-wall spacing
(WA) (see Fig. C).
In the event of a projection from the wall,
e.g. insulation material, the projecting
length of the built-into-wall bracket is re-
duced by the thickness of the projection (see
Fig. 4).
Prepare tools.
Drill holes. Note walling material.
Note: Brackets with lift restraints are installed
on top, outside and possibly additionally even-
ly spaced along the length.
Pre-install lift restraints.
Install built-into-wall brackets:
Note the orientation of the built-into-
wall bracket, slit to the top.
Make sure that the built-into-wall brack-
et's expansion zone is not completely
within a hollow space of the building
material used.
Align and secure the built-into-wall brackets.
Shorten panel if required and attach with
the raw edge to the wall.
Attach rosette.
For BH 1050: Install spacers (see Fig. 9–10).
Depending on the installation situation,
use spacer extensions as necessary.
Installing and securing the radiator (see
Fig. 11–13)
Place the radiator with the straps into the
brackets and align laterally.
Clamp the lift restraints over the radiator
straps.
Align radiator.
Standard version connection
Vent plugs (top) and blind plugs are factory
pre-assembled.
Unscrew painted blind plugs at the desig-
nated connection points.
Connect radiator with commercially avail-
able fittings upstream.
6
Tightly cap open connections with vent
plugs (top) and blind plugs.
Connection version with built-in valve
Valve with factory pre-set k
facturer's data).
Vent plugs (top) and blind plugs are factory
pre-assembled.
Remove painted caps on the valve mount-
ings and dispose of, as they must not be
used as seals on the radiator.
Connect radiator with commercially avail-
able fittings upstream on the valve mount-
ings.
Special connections
See manufacturer's data.
Commissioning
Remove protective packaging completely
during final cleaning or prior to commis-
sioning.
Fill the radiator and evacuate the air from it
via the air vent. Risk of scalding!
Check radiator and connections for leaks.
value (see manu-
V

Publicidad

loading

Este manual también es adecuado para:

Decor s 10 serieDecor d 10 serie