INSTALLATION INSTRUCTIONS
A. Flush all water supply lines of debris
Before connect bathtub water inlet pipe, first open water valve for a period of time to clean the debris from the pipe. Make sure that the debris will not
enter the bathtub pipe. So that we can effectively extend the life of the fitting.
B. Remove access panel
Temporarily remove all access panels. Part of the process of the installer can be more convenient to install through the access window.
C. Leveling the adjustable feet
1. Feet are extended for shipping purposes to provide clearance and protection of the front of tub. The tub should be reset by installer to proper
height required to level the tub.
2. Raise the four center feet so that tub rests only on the four corner feet.
3. Raise the corner feet to lower tub to desired height and level tub in both directions.
4. Verify bathtub level and lock the four corner feet in position.
5. Lower the four center feet so they firmly contact the floor and tighten in place.
6. When finished, tighten the nuts of the adjustable feet to fix the height of the bathtub.
D. Connect the water supply
For ease of use, our bathtub is equipped with stainless steel cold and hot hoses (connector 1/2", Packaged with faucet kit).
Please connect the cold and hot water hoses to the bathroom's cold and hot water hoses accordingly.
Note: The specification of the water inlet hose is 1/2". If there is no reserved 1/2" water inlet connector, please use a 3/4"
to 1/2" adapter shown (not included).
E. Connect the drain kit
The bathtub has a drain assembly installed and water tested. Follow the illustration to connect the drain assembly to the house's sanitation system.
F. Install the external grab bar assembly
1. Remove the protective packaging from the armrest.
2. Unscrew the fixing screw of the external grab bar and take out the washer
and lock washers.
3. Put the external grab bar on the bathtub as shown in the right picture, and
then fix the external grab bar with the removed screws, washers and lock
washers.
G. Water test
After completing the above installation steps, it is time to perform the post installation water test. This will detect water leaks caused by improper
operation of the installation process at an early stage and avoid losses:
1. Fill the bathtub with water at least 2" above the highest jets.
2. Verify drain plunger opens and closes freely.
3. Inspect underneath tub drain hose for leaks.
4. Run the faucet and handshower and inspect for any leaks at connection locations.
Installed
Not Supplied
2" PVC Elbow
13
Hubless Coupling
2" PVC Hose
U-Trap