Descargar Imprimir esta página

LF PROJECT SOURCE PS WCA JET WALK IN 60IN RH GT-6037WRH Manual Del Usuario página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

TESTING YOUR WALK-IN BATHTUB BEFORE INSTALLATION
All bathtubs are 100% water tested at the factory and have passed inspection. Transportation and
mishandling may loosen fittings and cause leaks. It is therefore necessary to test the bathtub while there
is access to all sides of the bath.
1. This unit should be both static and operationally tested with water. It is best to test the unit outside by
filling with a garden hose.
1.1. Place the bathtub on a completely flat surface in an area where it may be drained after testing.
1.2. Install th e door lever on the door that can be found inside the bathtub part's box .
1.3. Seal the drain hole (Use the drain plug in the part's box) and fill the bathtub with approximately 8"
of water.
1.4. Verify drain plunger opens and closes freely.
1.5. Fill the bathtub to top of seat level.
1.6. Repeat 1.4.
1.7. Fill the bathtub with water to the overflow.
1.8. Repeat 1.4.
2. Allow the water to stand in bathtub for 2 hours and then inspect all plumbing and seals for leaks.
3. Using appropriately rated three-prong extension cords, plugged in to separate outlets, operate the
whirlpool pump for another 30 minutes and inspect for leaks again.
4. Inspect the unions around the whirlpool pump. The whirlpool pump is connected by unions. If a leak persists at a union after tightening, it may have
been over-tightened or might have a displaced O-ring. Disassemble it and make sure the O-ring was seated properly.
5. Ensure that all jets are open and working, some hydro jets are adjustable for both flow rate and direction of flow. The jet flow rate is adjusted by
turning either the water mixture control clockwise or counterclockwise. Some hydro jets are not adjustable direction of flow where located at the
seat back.
6. If there are leaks, mark the spot(s), drain and repair with GE Silicone Sealer (fiber glass to PVC) or PVC cement (PVC to PVC). Repeat test when dry.
Check to ensure that your installation will conform to all applicable codes and secure necessary permits. All electrical and plumbing
connections should be made by qualified electricians and plumbers.
Failure to perform these tests before installation will make the installer liable for future repair costs.
PREPARTION BEFORE INSTALLATION
Make sure place you install the bathtub is strong enough to bear the total weight of bathtub, maximum water volume and the user.
Waterproofing process must be made in the place of bathtub installed, or down stair will get damaged if water leaks.
The installed place must equip with water supply, power supply and drainage:
This product uses universal home power.
Please reserve the drainage hole ≥ 2", make sure the drainage pipes accord with the drain kit.
User need to reserve the connector of 1/2" external thread cold/hot water hoses, which outstand the wall 1-1/2". It is suggested to install a valve in
each pipe, the location of installed should be designed by user, which is convenient for maintaining.
As each bathroom is slightly different, please place the bathtub according to the actual situation, the following illustration as reference layout.
Close to the wall
7
59
"
8
29
1
"
2
11
Screw in
anticlockwise
47"
16"
14"
7
31
"
8
14"
7
59
"
8

Publicidad

loading

Productos relacionados para LF PROJECT SOURCE PS WCA JET WALK IN 60IN RH GT-6037WRH

Este manual también es adecuado para:

5144544